This month there has been a lot of progress on the third floor, which includes the sleeping rooms (pictured below) in the domestic violence shelter wing.  Individual hooting and cooling units have been installed in each room, so that each family will be able to control the temperature in their room. And drywall has also been installed.

The concrete walls into the underground parking garage have are now finished and back filled. The secure underground parking will be used for residents in the domestic violence shelter.